EQUIPMENT
Metering cabinets

Almaty Project builds custom metering cabinets to customer requirements. Equipment configuration and design follow facility needs and the technical specification.
- Select meters and data acquisition units for the system configuration.
- Arrange equipment to meet project requirements.
- Integrate the cabinet into the resource metering system.
The photograph shows an example internal cabinet layout. Configuration and specifications are project-defined.
Metering cabinet documents
Documents are provided in their original languages. Changing the site language does not translate PDF files.
Sign in